The original scope of works was to replace 10% of the timber to refurbish the hall, however upon pulling the existing timber it was 90% that had to be replaced. CMP did this additional work in the time frame quoted for the original 10%.
The project was completed ahead of schedule. Special mention was made by the client on CMP’s performance, who ensured the health and safety requirements were implemented and met for the optimal safety of the children during the project.
The original scope of works was to replace 10% of the timber to refurbish the hall, however upon pulling the existing timber it was 90% that had to be replaced. CMP did this additional work in the time frame quoted for the original 10%.
The project was completed ahead of schedule. Special mention was made by the client on CMP’s performance, who ensured the health and safety requirements were implemented and met for the optimal safety of the children during the project.